201 Yesler Apartments, Seattle, WA. $15,100,000 Thirteen story concrete frame apartment building on a 6400 square foot building lot. Exterior skin includes precast spandrels, cast in place columns, CMU, and aluminum windows. First three stories are brick veneer with aluminum storefront and aluminum windows. PTAC heat and ventilation, steel stud interior framing, vertical exhaust chases, two elevators, and a central hot water system. Performed at Aecon Buildings.
Avalon Apartments, Gresham, OR, $10,500,000
225 new garden apartments on an approximately ten acre site. Project completed in less than eleven months using various techniques to perform sitework over unsuitable soils during winter months. Constructed using platform framing and finishes such as vinyl siding. Performed at American Home Builders.
Juanita Village Leasing Office and Retail TIs, Kirkland, WA. $800,000
High end retail tenant improvements for a barber shop, pizza restaurant, hair and nail salon, and leasing office/ amenity complex within a new apartment and retail complex. Project included coordinating interior design drawings with architectural requirements, scheduling exotic finishes and materials, and completing the project on a very tight schedule. Performed at Mego Construction.
The Bristol, Renton, WA, $22,000,000
New mixed use building on the Lake Washington waterfront in Renton. Project included 188 apartment units in three levels of wood frame construction over two levels of parking/ retail space. Project constructed on a driven grout piling foundation system. Performed at Mego Construction.
The Shelby, Seattle, WA, $11,000,000
New mixed use building in Seattle’s Belltown neighborhood. Project included ninety-eight apartment units in five levels of wood frame construction over two levels of underground parking and one level of retail space. Building was constructed to the lot line on all sides. Participated in negotiations with adjacent property owners for tie-back easements. Performed at Mego Construction.
BEQ 3 & 8, Whidbey NAS Oak Harbor, WA, $11,000,000
Renovation of two barracks at the Whidbey Naval Air Station. Included gutting existing concrete structures, installing new concrete shear walls, and then installing new systems and finishes to bring the 1940’s era barracks to current standards. Performed at ECI General Contractors.
BEQ 1 & 2, Whidbey NAS, Oak Harbor, WA, $5,700,000
Renovation of two identical barracks at the Whidbey Naval Air Station. Work included seismic upgrades and complete interior renovation of existing concrete barracks to current standards. Performed at ECI General Contractors.
Jefferson St. Medical Office Bldg, Hartford, CT, $5,000,000
Renovation of two 1860’s townhouses into new medical offices, including a new parking structure and conformance with historic tax credit laws. Performed at Goshow Associates.
High-End Co-op Renovations, New York, NY, various
High end interior renovations within existing buildings of varying ages. Projects included interior finishes, upgraded mechanical and electrical systems. Projects often included complex negotiations with building managers and co-op boards Performed at Goshow Associates.